Information and Rates for Developers and Builders

 

WATER AVAILABILITY CERTIFICATE:

          Per Certificate         $  35.00

 

DEVELOPER'S EXTENSION MANUAL:

              Per Manual          $  30.00

 
NEW METER AND SERVICE INSTALLATION CHARGES:

The meter installation cost is comprised of two factors – the cost of the equipment and installation plus the Capital Facilities Charge.  The charges are as follows:

 

SINGLE FAMILY RESIDENTIAL: 

                                                                                        SPU Regional

Meter Size   WD 20 Installation   WD 20 Facilities    Facility Cost      Total Cost

        1”                   $3,250                       $4,530              $1,081                 $8,861 

 
COMMERCIAL AND MULTI-FAMILY:

 

The total cost is the sum of the meter installation charge plus the Facilities Charge which are determined by the size of the meter.  Installation of meters larger than one inch is based on time and material with a minimum cost of $3,575.00.  If total time and material exceeds $3,575.00, the customer pays the added cost.  The rates are as follows:

                                                                                       SPU Regional

Meter Size   WD 20 Installation   WD 20 Facilities   Facility Cost       Total Cost

        1”                  $3,250                        $4,530             $1,081                $ 8,861

 1-1/2”                  $3,750(min)             $22,650             $ 4,825               $ 31,225

        2”                  $3,750(min)             $36,240             $ 7,720               $ 47,710

        3”                  $3,750(min)             $72,480            $21,230               $ 97,460

        4”                  $3,750(min)            $113,250            $29,915               $146,915

8:00 Am to 4:30 Pm

Phone: (206) 243-3990

Fax:     (206) 244-7514

Email: Kcwd20@Kcwd20.com

© 2015 King County Water District 20.