Developers Extension Manual:

Information and Rates for Developers and Builders
Hydrant Meter Rental Deposit:
WATER AVAILABILITY CERTIFICATE:
CITY OF BURIEN Per Certificate $ 45.99
UNINCORPORATED Per Certificate $ 42.58
NEW METER AND SERVICE INSTALLATION CHARGES:
The meter installation cost is comprised of two factors – the cost of the equipment and installation plus the Capital Facilities Charge. The charges are as follows:
CITY OF BURIEN SINGLE FAMILY RESIDENTIAL:
Burien SPU Regional
Meter Size WD 20 installation Utility Tax WD 20 Facilities Facility Cost Total Cost
1" $3,548.61 $283.89 $4,575.30 $1081 $9,488.80
CITY OF BURIEN COMMERCIAL AND MULTI-FAMILY:
The total cost is the sum of the meter installation charge plus the Facilities Charge which are determined by the size of the meter. Installation of meters larger than one inch is based on time and material with a minimum cost of $3,851.89. If total time and material exceeds $3,851.89, the customer pays the added cost. The rates are as follows:
Burien SPU Regional
Meter Size WD 20 installation Utility Tax WD 20 Facilities Facility Cost Total Cost
1” $3,548.61 $283.89 $4,575.30 $1,081 $9,488.80
1-1/2” $4,094.56(min) $308.15 $22,876.50 $ 4,825 $32,123.62
2” $4,094.56(min) $308.15 $36,602.40 $ 7,720 $48,744.52
3” $4,094.56(min) $308.15 $73,204.80 $21,230 $98,856.92
4” $4,094.56(min) $308.15 $114,382.50 $29,915 $148,719.62
UNINCORPORATED KING COUNTY SINGLE FAMILY RESIDENTIAL:
SPU Regional
Meter Size WD 20 installation WD 20 Facilities Facility Cost Total Cost
1" $3,548.61 $4575.30 $1081 $9,204.91
UNINCORPORATED KING COUNTY COMMERCIAL AND MULTI-FAMILY:
The total cost is the sum of the meter installation charge plus the Facilities Charge which are determined by the size of the meter. Installation of meters larger than one inch is based on time and material with a minimum cost of $3,851.89. If total time and material exceeds $3,851.89, the customer pays the added cost. The rates are as follows:
SPU Regional
Meter Size WD 20 Installation WD 20 Facilities Facility Cost Total Cost
1” $3,548.61 $4,575.30 $1,081 $9,204.91
1-1/2” $4,094.56(min) $22,876.50 $ 4,825 $31,796.06
2” $4,094.56(min) $36,602.40 $ 7,720 $48,174.29
3” $4,094.56(min) $73,204.80 $21,230 $98,286.69
4” $4,094.56(min) $114,382.50 $29,915 $148,149.39